Honestly it's in the eyes of the beholder; there is no meaning to any of it except that which we assign. What I believe strongly in may seem meaningless to you. I realize this is probably an annoying answer so here's a comic that capture's how I feel:
Highly doubt that any proper silicon fix is going to be out this year. Silicon validation is no joke, so I’d expect 3years before speculation issues are fixed properly. I think the new fixes will be in microcode instead
It depends on the complexity of the fixes. We're probably not talking additional instructions here, only some smaller microarchitectural changes (at least for Meltdown), which could conceivably take only 6-9 months to put into production after design.
I wouldn't expect anything before Q3, but Q3 or Q4 shipping does seem plausible.
The worst case is when they manage to fix Spectre/Meltdown but then introduce a bunch of other errata in the process because they rushed it. The errata lists for modern processors are already disturbingly long, and this is for things that aren't "merely" timing side-channels but actual "not as designed" defects.
Simulating and testing the design. You generally don't want to spend millions of dollars on a semiconductor mask set unless you're sure the design will work correctly.
This part usually takes longer than the actual logic design and transistor layout phases.
Also got to say Al Pacino is so insufferable. De Niro was excellent though. My favorite scene is the end in stand up guys (also Pacino is far more mellow and tolerable in that one)
> H1-B is designed to just be a pool to temporarily fill labor shortages in the US. It's not intended to be the path for PR hence why it's admittedly arbitrary.
I think that is incorrect. It is expected for F-1 students to move to an H1-B (which allows intent to immigrate) and then move to PR (usually via an EB)
Nice, does this get rid of the shitty AI for the janitor? I can't tell you how annoying it is to watch them do everything except clean the damn puke and trash of the path.
You can turn off mowing the lawn which will keep them on barf duty unless you have a giant flower garden in their work zone. It's pretty much necessary if you have a coaster with a moderate or higher puke value in the park.
Also don't forget that you can put bathrooms near the exit of an upchuck inducing ride to keep the paths a little cleaner.